Low MOQ for Full Hard Aluzinc Steel Roll - Galvalume Steel Coil – Lueding
Short Description:
Low MOQ for Full Hard Aluzinc Steel Roll - Galvalume Steel Coil – Lueding Detail:
Production Description
| Standard | AISI,ASTM,GB,JIS | Material | SGCC,S350GD+Z,S550GD+Z,DX51D,DX52D,DX53D |
| Thickness | 0.13-1.2mm | Width | 600-1250mm |
| Tolerance | “+/-0.02mm | Zinc coating | 60-275g/m2 |
| Coil ID | 508-610MM | Coil Weight | 3-8 tons |
| Technique | Hot rolled, cold rolled | Package | seaworthy package |
| Certification | ISO 9001-2008,SGS,CE,BV | MOQ | 25 TONS (in one 20ft FCL) |
| Delivery | 15-30 days | Monthly Output | 10000 tons |
| Surface treatment: | oiled,passivation or chromium-free passivation, passivation+oiled, chromium-free passivation+oiled, resistant to fingerprints or chromium-free resistant to fingerprints | ||
| Spangle | regular spangle | ||
| Payment | 30%T/T in advanced+70% balanced;irrevocable L/C at sight | ||
| Remarks | Insurance is all risks and accept the third party test | ||
PRODUCTS SHOW
PRODUCT DETAILS
WHY CHOOSE US ?
Service

Product detail pictures:



Related Product Guide:
We hold strengthening and perfecting our items and repair. At the same time, we get the job done actively to do research and progress for Low MOQ for Full Hard Aluzinc Steel Roll - Galvalume Steel Coil – Lueding, The product will supply to all over the world, such as: Brasilia, Jeddah, Paris, Our company has always insisted on the business principle of "Quality, Honest, and Customer First" by which we have won the trust of clients both from at home and abroad. If you are interested in our solutions, you should do not hesitate to contact us for further information.
Q: Are you trading company or manufacturer ?
A: We are factory for galvanized steel coil, Aluzinc steel coil, PPGI and roofing sheets.
Q: How about your quality?
A: Our quality are good and stable. The Quality Certificate will issued for each shipment.
Q:Where is your main market ?
A: Our main market is in Middle east, Africa, Southeast Asia, India,Japan,etc.
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment or 100% L/C at sight.
The factory workers have rich industry knowledge and operational experience, we learned a lot in working with them,we are extremely grateful that we can encount a good company has excellent wokers.





